Engineering Excellence Achieved
Large, High-Temperature Ducting
Industry: Power
Scope: Assembly and Lifting Studies
In order to improve the construction time on site, and significantly reduce overall costs, VTP engineers assisted in the design and engineering of pre-constructed fully-clad ducting sections off-site and then transporting them to their final position. The final piece shown here, weighed in at almost 100-tonnes, was lifted from a single point and was installed in its final position on site within 12 hours.
Outcome: Significant success.

Vibration Analysis and Design Improvement
Industry: Mining
Scope: Failure Investigation
By obtaining measurements on site, and through comprehensive data analysis, VTP engineers have identified the root cause of multiple failed large-diameter agitators on site. After identifying the root cause, the agitator design was lightly modified, and the modification was implemented on site. The improved life of the agitators resulted in significantly less down time for the mining facility.
Outcome: Significant Success

On-Site Repairs of Storage Tanks
Industry: Mining
Scope: Tank Repairs
By designing temporary support frames and a carefully planned installation sequence, VTP engineers enabled the on-site replacement of significant portions of a large-diameter steel tank within a short time, minimising down time for the plant and ensuring long-term continued production by the equipment.
Outcome: Success

Engineering Excellence
Specializing in design, inspection, and modification of static equipment for optimal performance.